Objective
• Understand the current process and performance
• Finalize CTQs and metrics related to project goals/objectives
• Identify the metrics/variables to be measured
• Define input and output variables and the relationship between them (use Cause-and Effect diagram)
• Develop operational definitions for all measurements
• Identify data collection plan and procedures and design data collection forms
• Assess measurement systems
• Perform measurement system analysis
• Collect necessary data
• Validate data/ draw valid conclusions using appropriate statistical tools and methods
• Evaluate process capability/performance of metrics
• Identify key input and output variables
Deliverables
• Input variables on which data are to be collected (or, x data to be collected)
• Operational definitions
• Data collection plan and procedure
• Data types and sampling
• Measurement system analysis
• Sigma level
• Process capability analysis
